Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Phase Description
Brown County US 377 Main Street Preliminary Design Improve US 377 (Main Street) in Brownwood to enhance traffic flow and safety
Comanche County SH 6 Preliminary Design Upgrade and widen SH 6 from SH 16 N. to East De Leon city limits
Comanche County SH 36 Preliminary Design Improve SH 36 from US 67 to CR 324
Eastland County SH 6 Preliminary Design Improve SH 6 in Gorman, from 0.18 mile north of Crescent Street to the Comanche County Line
Eastland County I-20 Construction Realign and reconstruct roadway at Ranger Hill
Lampasas County US 281 Preliminary Design Reconfigure the US 190 (Plum Street) intersection and reconstruct US 281 between Sulphur Creek and the Burnet County Line
Lampasas County US 190 Intersections Improvement Project Preliminary Design Improve two US 190 intersections, which includes FM 2808 at US 190 and FM 2313 at US 190
San Saba County FM 45 Study Reconstruct and widen the existing two-lane undivided roadway