Located within the city of Houston in Harris County, this project is a vital link on the Hempstead roadway and will provide traffic an alternate route to US 290. The proposed project consists of the construction of a six-lane divided urban street facility.
Project Limits
Limits are Hempstead Road 0.059 mile west of West 12th Street to east of the Washington-Katy split.
Proposed Improvements
This project consists of a significant amount of construction on UPRR facilities, including the replacement of three existing railroad overpasses and related track realignment.
The tables below list the specifications and provisions required by the Union Pacific Railroad in order for construction work to be performed by the TxDOT contractor inside the UPRR right of way. These documents are also referenced in the main TxDOT railroad specification contained within the project's plans, specifications and estimate (PS&E) documents.
Miscellaneous | |
Guidelines for Temporary Shoring |
![]() |
General Conditions and Specifications |
![]() |
Special Conditions |
![]() |
Contact Us
TxDOT Houston District
Public Information Office
P.O. Box 1386
Houston, TX 77251-1386
(713) 802-5076
Email
Copyright 2019
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701