Phase 3 consists of the engineering and environmental studies. During this phase, the final alignments are presented for the preferred alignment. Studies are conducted to define environmental impacts to both the natural and human environment. Public input/comments are part of the public involvement process. Loop 88 is divided into four segments: Segment 1 and 2: US 84 (Shallowater) to US 62/82 (Wolfforth); Segment 3: US 62/82 (Wolfforth) to US 87 (South Lubbock); and Segment 4: US 87 (South Lubbock) to US 84 (Slaton).
A public meeting was held on Tuesday, July 24, 2018 for Segments 1, 2 and 4.
Segment 1 and 2: US 84 (Shallowater) to US 62/82 (Wolfforth)
Segment 3: US 62/82 (Wolfforth) to US 87 (South Lubbock)
Meeting Presentations
Route Alignments
Archeology Studies
During environmental studies for the project, TxDOT archeologists discovered prehistoric animal bones. Visit the Environmental Affairs Story Map to learn more about the discovery and about TxDOT’s field work Beyond The Road.
Segment 4: US 87 (South Lubbock) to US 84 (Slaton)
Contact Us
TxDOT Lubbock District
135 Slaton Road
Lubbock, TX 79404-5201
(806) 748-4490
Email
Copyright 2019
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701